Saturday, March 22, 2014

Spring Break Mini-cation and a Big Frog

I finally traveled down to the cities for a few days of friend time with no work attached, and it was much-needed and enjoyed!

I spent a day and night with my friend Val first, and we got to do some great lady stuff!  We climbed, ate ice cream, and even checked out a candlelight yoga session at a downtown Minneapolis yoga studio.  My last morning with her, we went for a nice walk around Minneapolis with coffee!  I haven't really aimlessly walked around Minneapolis much, so doing it with a friend was a nice change of pace.

After some quality Val time, I rocketed over to Woodbury to hang out with my brother and his girlfriend.  I finally got to see Frozen (AWESOME) with Kendra, and after my brother got home from work, we all went to Red Lobster for dinner!
Friday I had a climbing session with my old friend Jenelle, who I haven't seen in eons!

I've known Jenelle since my undergraduate years at UMD.  She actually got me my job at the dance studio I work at 4 years ago, which I am forever indebted to her for.  We got to catch up, climb a bit, and talk dance for awhile.  Since she currently has dance, grad school, and family obligations like crazy, I was really excited to have a little time with her in both of our busy schedules!  Overall, it was really nice to run off for a bit to see some of my friends and family, and it'll definitely sustain me for the next few days as school stuff picks up again.
While down in the cities, I worked a little bit on Taylor's Honey Cowl, and it's slowly but surely beginning to grow.  I'm hoping to finish this thing in the next week or so, as the "Things I need to knit NOW" list becomes bigger and bigger.

Knitting with pure white is also perhaps a little less than inspiring at the moment, as Duluth got another 6 inches of snow while I was gone, and I'm feeling the need for more bright things in my life!  Speaking of bright and happy things, I found a beautiful needle case on Etsy a week or two ago, and it was waiting for me when I returned from the cities!

Can you tell I perhaps still had the Sochi Winter Olympics still in my mind?  This was a treat for myself for finishing Scott's Dude Sweater (which I will blog soon, I promise!) and winning my gold medal in the Ravellenic Games.  It's beatifully made, huge,and for practicality sake, it's fantastic to be able to look at the pockets and know exactly what I have knitting-needle wise.

It also means that I no longer have to search for the needles that I need!  I used to put all my needles jumbled together in an old can, so finding five needles the same size turned in to at ten minute search every time I started a project.  Not okay, and finally solved!

Last but not least, I grudgingly took the step this morning that I needed to with the Narwhal mittens.  It was hard, but I wasn't happy with how they were turning out.  The gorgeous yarn I originally chose was much too springy for the fair isle without bunching up, and it wasn't the quality knit that I was going for.
So I pulled the needles out...

Took a deep breath...

And wound back the yarn.
It's okay though, because as you might notice in the pictures, replacement yarn is standing by!
When I was down in Woodbury, my brother's girlfriend Kendra and I visited a small but fantastic little local Woodbury yarn store, where I picked out some new Dalegarn Falk to use for the outside of the mittens.  I know that in the long run, I'll be much happier with the mittens with this yarn as the outside, despite the sadness of all that work going down the tubes.  Quality is important, right?  As for the original yarn, I plan on making a simple but pretty cowl with the pink yarn to give to Brit along with the mittens, so it's not going to sit around in my yarn drawer for very long.
That way, next Christmas, I can gift her a pretty set of bright pink knits that she can wear together. :)
Now I just have to cast on for the mittens... again.
Good thing I liked the picot trim...

Tuesday, March 18, 2014

Dance Weekend and FO: Honey for Hannah

I didn't get much of a break after midterm week and duty days ended before launching in to dance competition weekend!  It was a little hectic and stressful, but it was also a lot of fun to see all of my dances and dancers up on stage for the first time in full costume with hair, props, and the excitement of performing on their faces!

My dances did pretty well for a first competition- my little pirate girls even got a Judge's special award for their precise tapping!  I'm definitely more energized on the other side of the competition to really pick apart technique, performance, and details that will earn higher points next time around.  Our next competition, luckily, isn't until the end of April, so I have plenty of time to work with my dancers to clean everything up.
While at the competition, I did have time during awards to get some knitting done.  The only problem was I didn't want to work on presents for people that were at the competition, so I cast on for a hat that will match the mittens I made over Christmas break!

It's a pretty simple striped beanie hat using the same yarn I used for the mittens, so not only am I stash-busting a little bit, but for the first time ever, I'm knitting myself a matching hat & mitten set!
The pattern was perfect to work on- I could listen to the awards, chat with parents, and my hands were kept busy with stockinette stitch.
That doesn't mean I've been slacking on other projects- I finished the Honey for Hannah cowl yesterday, and it's pretty fantastic!

Pattern: Honey Cowl by Antonia Shankland
Yarn: Classic Elite Yarns Fresco in a bright red (I used a couple different filters on the pictures to try to get the in-person color- it's between the deeper and the brighter red).
Size: I made the medium, which is casting on 160 stitches and knitting through 2 skeins of the Fresco.

Timeframe: February 26 - March 17
Worst Part: How long it took me to finally make this pattern.  I guess I always assumed it was some weird stitch that would be time-consuming to make for a cowl, when in fact it's the exact opposite- quick knit, great pattern!
Best Part: Probably the yarn.  The color is our studio color, and it's heavenly to wear around the neck.  I'll have to store this somewhere I can't see it so I don't accidentally wear it...

Fresh off of Hannah's cowl, I cast on one more for my soloist, Taylor!

I'm making hers out of some lovely Plymouth Yarns baby llama wool, and even though it's going to be a little less wide (one skein is only 273 yards vs. the 2 skeins of  328 yards) it'll still be just as yummy.  It's also going to be great travel knitting when I head down to the cities tomorrow to hang out with friends over my spring break!  As a teacher, my break so far has been more of the lesson-planning and grading type- so basically a normal school day, minus teaching classes.  Visiting friends and family members for the latter half of the week will be a nice treat!
And I'm going to be churning out knitted goods like no tomorrow... :)

Thursday, March 13, 2014

Midterm Week and FO: Bad Yarn Kitty Hat

This week has been crazy.  It's midterm week at my college, which means progress reports and meetings and stressed out students (and teachers) as we all try to get stuff done before spring break starts next week.

I've spent a lot of extra time at my desk, grading, writing lesson plans and making lists, meeting with students, and generally trying to get as much done as possible so next week is less "catching up" and more "planning ahead".
When I'm not at school, I'm at the dance studio.  Our first big competition is this weekend for our groups, and I've been putting in extra time for not only rehearsals but getting props ready and logistics covered so this weekend runs smoothly.
I have a long duty day tomorrow at LSC full of meetings (where I'll hopefully finish Hannah's cowl!) and a long weekend both at the studio and at the competition, so I'm already looking forward to my break from classes next week.  Ideally I'll be visiting friends and relatives in the cities for some much-needed recovery time!
In the meantime, knitting is still chugging along slowly, but I have something to show for it at least!
Remember this debacle I mentioned a few weeks ago?

I finally finished the replacement hat for Scott after Maeby ate two large chunks out of the rim of his Fall hat.  Hopefully his Bad Yarn Kitty Hat will be safely tucked into a pocket or out of the reach of troublesome kittens!

Pattern: Turn a Square hat by Jared Flood
Yarn: Cascade 220 in midnight blue and Noro Kureyon in shades of blue-brown
Timeframe: February 26-March 12

Mods: I cast on the 96 stitches with size 7 needles and didn't do the increases as instructed.  That means when I set my stitch markers for the decrease round, I K24, pm, K24, pm, K24, pm, knit to end of round, and then followed the instructions per normal for the decreases.  It's what I'm starting to do more often for this pattern, and I like it for knitting a guy's hat.  For a lady, I'll probably CO less stitches when the time comes.
Worst Part: Discovering that Maeby ate yet another piece of clothing and I would have to replace something yet again.
Best Part: Getting motivated to keep churning out these hats.  So easy, not too monotonous to knit with the switching colors, and pretty quick to finish.

I enjoyed using Maeby as part of the hat's photo shoot, and she enjoyed rolling around on the floor and rubbing her face all over the hat.  Now I have to make sure we keep this one out of harm's way, so I don't have to make another one...

Sunday, March 9, 2014

Getting Better

It's been awhile since I've written, for good reason.  Our little apartment has turned into a small cesspool of unhappiness with the stomach flu.  Scott got it first, and was down for a good 3-4 days while I went between teaching and taking care of him.  Then, at the end of the week, I caught the bug and couldn't keep anything down.  Today is the first day I've been back on the horse, eating full meals and even teaching three hours of dance this afternoon (though I collapsed on the couch afterward).
I've been able to get a fair amount of knitting done, since being sick means I can't focus much on grading or cleaning.  I'm over halfway done with the Honey Cowl for Hannah, one of the three knits for my solo/duet ladies.

I have to admit, I love love LOVE this pattern.  It's fast, it's easy to do when my brain isn't functioning on full capacity, and I'll probably be done with it within the next couple of weeks here.  I'm also decreasing at the top of the hat that I'm knitting for Scott, and should be done with that soon as well!

I feel like I should just perpetually be churning these Turn-a-Square hats, in case either Maeby keeps eating them or someone needs one for a present.  I do owe one to Bobby, who accompanied my friends and I to the Red River Gorge last fall.  They're a great stash-buster as well, since I have a lot of leftover Cascade 220 worsted weight from various projects.
Tomorrow is a full day of dance, work, meetings, and (possibly) yoga. I'm not sure yet if I'm going to go to yoga- depends on how I feel when I wake up.
I push a little too hard sometimes when I'm coming back from being sick, so I'm going to try to take it a little easy tomorrow and Tuesday.  We'll see... :)

Sunday, March 2, 2014

FO: Lorax Mustache for the Mustache March Run

Even though I started some great projects after I finished the owl hat, I had to take a one-night detour to make a ridiculous knit that is fast becoming a yearly tradition.  Saturday was the third annual Mustache March Run here in Duluth along the lakewalk, and as per tradition, I knit a mustache to wear for the run!
I decided that this year, instead of making a random mustache, I would make a mustache based on Dr. Suess's brilliant book The Lorax.  That guy, after all, has an insane mustache!
I definitely made up a lot of what I was doing, since there was no "Lorax Mustache" available online.  
I used Size 6 DPN's and CO 3 stitches with bright yellow worsted-weight yarn, then knit about 28 inches of I-cord.  Just enough to wrap around my head and tie comfortably without too much extra dangling down.
I then used the book Knit Your Own Moustache by Vicky Eames to knit the "Walrus Mustache", which was a real quick knit.  I still used the size 6 needles, despite the pattern calling for size 4. 
To get the shape of the Lorax 'stache, I whip-stitched the bottom of the mustache to the i-cord, so the Walrus Mustache was actually upside down when I would put the mustache on my face.
This allowed me to get the Lorax look that I wanted.
It was time to add the bushy part!  I cut a ton of 4-7 inch long lengths of yarn, and used a tapestry needle to just thread them through a stitch on the main part of the mustache.  To make it easy, once I pulled the length through to halfway, then just double-knotted the length of yarn, so it was secure on the mustache.
Near the outside edges of the mustache, I kind of gathered the rest of the tied lengths so I could "shape" what the Lorax mustache was supposed to look like and double-knotted the gathered lengths up so it would look like a big bushy mustache shooting out to the sides and down!
It worked out really well, and I was really happy with how it looked when I was done for only one night of work!
Race day dawned bright and a little on the chilly side...
The wind chill pushed the temp down to about -35, but that didn't stop almost 500 people to meet out on the lakewalk next to Lake Superior to run 2.65 miles!  I bundled up with my winter camping/snowshoeing/ice climbing gear (wicking-warmth-weather!) and tied the mustache on my face for a fantastic face warmer!
I ran with three awesome other ladies, and despite the chilly temps, ice on the run, and complete lack of cardio fitness for me, I finished the run in about 32 minutes.  I was even warm and excited when I crossed the finish line!
It was a great race, and made even better by running with old and new friends!
I even had a support person at the finish line- Scott!  He took a break from homework to come cheer me on (while wearing all the warmest clothes he could).  He may have gone inside and had a beer for about 20 minutes while I was running, but he was there when I finished with smiles and a hug, so I'm not complaining. :)
(Note the icicles beneath my nose- yes, I have mustache icicles!)
It was a fantastic little event in the middle of this ridiculous cold the northland is trapped in, and it was a nice chance to get outside on a day I would have probably stayed in. :)

Wednesday, February 26, 2014

FO: Superb Owl Hat and Organizing

My friend Sarah's birthday is on Friday, and at the bottom of her birthday box (currently racing its way across the chilly Minnesota mail system) is a tiny little something for her little man, Ben!
I finished the little hat during the closing ceremonies of the Olympics, since I was done done done with the Dude Sweater!  I present to you the Superb Owl hat, freshly finished with one set of eye buttons!
Pattern: Owlie Sleep Sack Matching Hat by Teresa Cole (I only did the hat; my friend Heather did the sack- link goes to the blog page with the pattern)
Yarn: Rowan's Creative Focus in Worsted.  I doubt I used even half of the skein.  I wasn't a huge fan of the yarn, as it was prone to splitting.  Not sure what I'm going to do with the rest of the skein...
Needles: size 7
Timeframe: February 1st-February 24.  The only reason it took that long was I knit the first part while watching the Superbowl and the rest of it almost a month later in about 3 hours.  
Mods: None!
Worst Part: I had a minor hiccup trying to figure out what "C4B" and "C4F" meant, with no explanation on the pattern and no cable charts.  I figured it out by looking at the picture, but apparently I've been away from cable for too long.  I wasn't honestly a huge fan of the hat in general, but it was a quick knit so I can't complain too much...
Best Part: When Albert jumped up on the couch to join the photo shoot!  
After finishing the Owl hat and the Dude sweater, I finally did a complete over-haul of the knitting drawer.
I cleaned out all of the old skeins and post-it notes and loose balls of yarn; it was a pretty big mess in the midst of it.
When I was done, I assessed my projects needed and got everything set up, ready to go for easy-access knitting!
One of the first things I cast on for was another Turn-a-Square hat.  Why, you might ask?
Because the lovely little Maeby decided to turn Scott's fall hat I knit him into kitten noms.  Damn cat.  This new one is going to be in a dark blue for the main color and the graduations are various shades of blue in a pretty Noro yarn.  I know I'll be knitting a second one pretty soon after this one is finished, just to have one on deck in case Maeby eats the new one...
I also cast on for the first of three end-of-year dance presents I'll be knitting.
This one is going to be the Honey Cowl for my vivacious dancer in the duet I choreographed.  I cast on for it today so I can bring it to Friday's all-day conference on the teaching of writing in the classroom that LSC will be putting on.  I'm leading one of the sessions for the conference, which I'm pretty excited about!  I wanted to make sure I had an easy knit for the rest of the sessions, and this one seems like it will knit up as a dream.
Or, at least, I'm hoping it will.

Sidenote: I haven't forgotten to do an FO post about the Dude- I'm just waiting for a good day to get pictures of Scott actually wearing it, possibly outside.  That's been hard when the temp isn't higher than 0 and the windchill is between -30 and -40, like it is this evening.  I'm so ready for winter to be over...

Friday, February 21, 2014

Ravellenic Finish Line!

It's been a crazy last 24 hours!
Last time I updated, I was finishing up the second sleeve on a Wednesday afternoon.  That evening, I went down to the climbing gym for a fantastic 3 hour session with my friend Bailey.  I really needed it, especially since it was the last session before the competition on Saturday.  I watched figure skating as I completed the sleeve.  Getting that done was huge- all the major pieces of the sweater were complete!
Yesterday was school and a snowstorm!


We got about 16 inches of snow last night, and today the wind gusts got up to 40 mph.  The only good thing about the crazy snowstorm was more knitting time as I watch the ladies figure skating free skate!
I knit the facings for the front of the sweater, and I made a bit of a mod- incorporating three buttonholes using Ysolda Teague's one-hole buttonhole method from her book "Little Red in the City".

I finished pretty late, since I didn't want to stop until both facings were done.  This meant that today, Friday, all I had to do was seam the pieces, weave in the ends, sew on the buttons, and knit the collar.

I lay out all the pieces and got to work on the arms.
The kittens kept trying to get their faces in wherever they weren't particularly wanted, both trying to take naps on the body of the sweater...

and when I take a break to get a quick snack...

But after all the hours of knitting, all the seaming, all the sore fingers and late nights, I lay The Dude down at around 2 this afternoon, and I had to smile.

The Dude is done.
I submitting it to the finish line of the Ravellenic games, and tonight I'm going to pour myself a victory glass of wine.
Gold medal in the WIP Dancing- achieved.  :)

I'll post my actual FO summary later.  Now is time for wine. ;)